Name for Entries: Worldwide Session on Central Space Planning and Core Zone City Design for Pingshan, Shenzhen
The Worldwide Session on Central Space Planning and Core Zone City Design for Pingshan, Shenzhen has formally launched. The aim of this worldwide session is to assemble world perception and main concepts and to solicit design proposals which might be each imaginative and viable. Now it’s open for registration from famend design establishments each domestically and internationally.
1- Location Overview
Situated within the jap a part of Shenzhen, Pingshan serves as an vital gateway for the Guangdong-Hong Kong-Macao Better Bay Space to develop eastward, in addition to a key node within the Guangdong-Hong Kong-Macao Science and Expertise Innovation Hall.
Pingshan consists of Central Space, Hello-Tech Zone, Bihu Space, and Maluanshan Ecological Space.
2- Undertaking Scope
The scope of this worldwide session consists of three ranges: analysis, planning and general city design, and detailed core zone city design.
Scope of analysis: The analysis will cowl the complete Pingshan District with joint consideration of the coordinative relationships with surrounding areas, together with Baolong Sub-district of Longgang District, Dapeng New District, Yantian District, Huizhou Daya Bay Financial and Technological Improvement Zone, and Huiyang District of Huizhou Metropolis.
Scope of planning and general city design: The mission covers a complete space of roughly 46.4 sq. kilometers, extending east to Lanjing Highway, south to Nanping Expressway, west to Jinlong Avenue, and north to Songzikeng Reservoir.
Scope of detailed core zone city design: The core zone covers an space of roughly 6 sq. kilometers, extending east to the west aspect of the Shenzhen Pingshan Complete Bonded Zone, west to Shenshan Highway and Dongzong Highway, south to Jinniu Highway and Pingshan Avenue, and north to Danzi West Highway. The precise city design shall be targeted on roughly 2.7 sq. kilometers within the jap part of the core zone and roughly 1.6 sq. kilometers within the western part of the core zone.
3- Undertaking Background
Shenzhen is without doubt one of the core engines of the Guangdong-Hong Kong-Macao Better Bay Space. Because the jap middle of Shenzhen, Pingshan bears the strategic mission of being a core supporting space of superior manufacturing, a high-tech business cluster, and a future business experimental zone. It can speed up the creation of the regional metropolis middle that influences and boosts the Shenzhen metropolitan space and surrounding areas, and the creation of “Revolutionary Pingshan, Metropolis of Future”.
The city planning and design work within the Central Space of Pingshan needs to be scientifically carried out in accordance with ecological civilization thought and the idea of inexperienced growth to advertise the institution of a future-oriented, clearly organized, and adaptable general spatial framework, plan a spatial growth blueprint that mixes future feasibility with present actuality, and formulate implementable systematic options.
04 Content material of Session
4.1 Planning and General City Design (46.4 sq. kilometers)
4.1.1 Planning Research
1) Regional synergistic growth technique
2) Optimization and enhancement of the planning
3) Planning implementation technique
4.1.2 General City Design
1) Spatial order framework
2) General spatial format
3) Attribute house creation
4) Research of the supporting programs
4.2 Detailed Core Zone City Design
4.2.1 Core Zone (6 sq. kilometers)
1) City design conception
2) General panorama design
3) Built-in design pointers
4.2.2 Japanese Part of the Core Zone (2.7 sq. kilometers)
1) General conceptual scheme design
2) Optimization design alongside the Center Part of Pingshan Avenue
3) Enterprise district planning and vitality creation
4.2.3 Western Part of the Core Zone (1.6 sq. kilometers)
1) Hub and Gateway Design
2) Complete visitors group
3) Enterprise format and spatial type
05 Registration Necessities
5.1 The registration is open to worldwide candidates with no necessities on qualification. contributors should be impartial authorized entities or partnerships or different organizations registered in or outdoors China. Totally different authorized individuals which have a direct controlling relationship or administrative relationship or whose authorized representatives are an identical shall not register for the session on the similar time. The dad or mum firm and its subsidiaries shall not register for the session on the similar time, however completely different subsidiaries of the identical dad or mum firm can register for the session concurrently if they’re impartial authorized entities and would not have a controlling or administrative relationship.
5.2 Registration by a consortium comprising not more than three members is allowed. In that case, no member of a consortium shall be allowed to enroll twice both independently or by becoming a member of one other consortium. All members of the consortium shall signal a legally-binding Consortium Settlement, and the main member and work division amongst events shall be specified.
5.3 No registration shall be accepted in people or together with people.
5.4 The taking part group accustomed to China’s nationwide situations and has the next comparable design expertise shall be given precedence:
(1) Having expertise in city design initiatives in city central areas much like the positioning and growth objectives of Shenzhen East Central Space;
(2) Having expertise in city design initiatives in complicated giant city hub areas and world-class enterprise districts;
(3) Having expertise in city planning and design initiatives with the combination of ecology, manufacturing, and life;
(4) Having expertise in implementing detailed city design initiatives all through the entire course of in key areas.
5.5 Individuals taking part on this worldwide session should be those enrolled of their organizations. The mission chief and the chief should be assumed by the individual(s) who has/have presided over comparable initiatives as described in 5.4, and should take part in the entire means of design. To be able to make sure that the group members have an correct understanding of the related background and necessities, there needs to be at the least one individual on the group who’s proficient in Chinese language.
6- Consulting Procedures
The worldwide session is split into three working levels: “registration and pre-qualification”, “scheme design” and “final result assessment”.
6.1 Registration and pre-qualification stage: A Pre-qualification Overview Jury shall be established by the sponsor and the undertaker to comprehensively take into account the company creditability, company efficiency, and group competence, and choose 6 shortlisted groups (with out rating) and a pair of various groups (with rating) to enter the scheme design stage.
6.2 Scheme design stage: The 6 shortlisted groups full the scheme design in accordance with the necessities of the Worldwide Session Design Temporary and submit the whole achievements to the sponsor and the undertaker.
6.3 Consequence assessment stage: An Consequence Overview Jury shall be established to pick the highest 3 of the 6 shortlisted groups and suggest them to the sponsor and the undertaker. On the premise of absolutely respecting the knowledgeable assessment opinions, the sponsor and the undertaker shall decide the rating of the highest 3 winners, and grant awards of corresponding quantities to six shortlisted groups.
7- Agenda
Notes: The above agenda is topic to Beijing Time and the sponsor and the undertaker reserve the appropriate to regulate the schedule as acceptable.
8- Awards
Related awards for the Worldwide Session shall be paid in CNY as a tax-included quantity. Any taxes arising therefrom shall be on the payee’s expense.
- Profitable prize (one winner): ¥4,500,000.00;
- Most popular prizes (two winners): ¥3,500,000.00 every;
- Finalist prizes (three winners): ¥2,000,000.00 every.
After the end result assessment of the worldwide session, the six shortlisted groups shall be required to cooperate with the outcomes integration group (commissioned individually by the sponsor and undertaker) to finish the technical integration work.
9- Acquisition
Supposed contributors should fill within the Registration Kind and the Dedication Letter for Confidentiality and submit them to the mailbox (SZPS-PD@szrjrx.com) to acquire the Worldwide Session Paperwork (together with Work Guidelines, Design Temporary Define, and so on.). The contributors within the pre-qualification software paperwork submitted shall be the identical as these within the Registration Kind. For any newly added participant, an extra Dedication Letter for Confidentiality shall be submitted. (Click on the hyperlink or scan the QR code beneath to obtain the Registration Kind and the Dedication Letter for Confidentiality.)
10- Submission
10.1 The whole pre-qualification software paperwork shall be submitted (on-site or by mail) to NO.1212, 12F, Block B, Xintian Century Enterprise Heart, Futian District, Shenzhen (contact individual: Ms. Li at (+86)13632658134) earlier than 15:00, September 4th, 2023 (UTC+8).
10.2 Fill within the Letter of Legal professional (for on-site submission) (Confer with the Appendix in Work Guidelines for codecs). The licensed agent shall convey this Letter of Legal professional and ID card to complete an on-site submission of the pre-qualification software paperwork. The Letter of Legal professional for mail submission won’t be required.
10.3 The laborious copy paperwork obtained on-site on the designated location shall prevail, and no overdue submitted software paperwork shall be accepted.
11- Others
After the Worldwide Session final result assessment, the sponsor and undertaker will provoke the work associated to the design of the six deepening growth areas to facilitate the implementation of the Worldwide Session outcomes.
The strategy for choosing companies for the design of the deepening growth space, design charges, and different particulars shall be ruled by the following detailed pointers offered by the sponsor and undertaker. The design scope shall be outlined by the following deepening section design temporary.
12- Contact
Industrial half: Ms. Li, (+86) 13632658134
Technical half: Ms. Solar, (+86) 13922819760
(UTC+8, 9:00 – 12:00, 14:00 – 18:00, Enterprise day)
The sponsor and the undertaker reserve the last word proper to interpret the principles of this Worldwide Session. If the Chinese language and English editions disagree, the Chinese language version shall prevail.